Hi Shaun,
When I was doing a mass punch-out for my employees on 12 Dec 2008 at 20:30, TimeTrex stamped on 11 Dec 2008 at 20:30 even though there is already a punch out at 20:30. In the end I got 2 punch outs on 11 Dec 2008. When I click on the incorrect 20:30 link on 11 Dec 2008, the details shows as 12 Dec 2008 20:30.
What do I need to look out for to solve this?
Thanks and regards,
Jeevan
Incorrect Mass Punch Out
Hi Shaun,
I spoke too soon. The problem still exists. I noticed that in the status report after I submittted indicated a different time to what is shown in the timesheet. For example,
Mass punch: IN 24-12-2008 @ 7:30
Status report: 23-12-2008 @ 23:30 (Success)
Timesheet: IN 23-12-2008 @ 7:30 -- hyperlink indicates 24-12-2008 @ 7:30
Regards,
Jeevan
I spoke too soon. The problem still exists. I noticed that in the status report after I submittted indicated a different time to what is shown in the timesheet. For example,
Mass punch: IN 24-12-2008 @ 7:30
Status report: 23-12-2008 @ 23:30 (Success)
Timesheet: IN 23-12-2008 @ 7:30 -- hyperlink indicates 24-12-2008 @ 7:30
Regards,
Jeevan