Hello,
Is there a way to run batch reports, for example the Punch Summary report, that can be run from the job scheduler?
And is there a way to provide the date range as a parameter or something that the report would need to run properly?
Thank you in advance ...
Search found 6 matches
- Wed Jan 14, 2009 6:04 am
- Forum: Developers
- Topic: Batching reports
- Replies: 4
- Views: 6196
- Tue Jan 06, 2009 1:59 pm
- Forum: Help
- Topic: TCP onnections
- Replies: 6
- Views: 3466
I would like to be able to run things through a job scheduler. We have a small staff and no one person can be dedicated to any specific task. When people are out, sometimes procedures can be forgotten and such causing a ripple effect of problems. That is the primary purpose for wanting to run extrac...
- Tue Jan 06, 2009 12:43 pm
- Forum: Help
- Topic: TCP onnections
- Replies: 6
- Views: 3466
- Fri Jul 18, 2008 2:23 pm
- Forum: Help
- Topic: TCP onnections
- Replies: 6
- Views: 3466
- Fri Jul 18, 2008 2:02 pm
- Forum: Help
- Topic: TCP onnections
- Replies: 6
- Views: 3466
TCP onnections
Does the postgresql accept tcp connections?
Im trying to view the DB with a SQL client program and cant connect
Im trying to view the DB with a SQL client program and cant connect
- Wed Aug 29, 2007 6:57 am
- Forum: Installation Help
- Topic: TimeTrex - Windows 2000 Install Problem
- Replies: 1
- Views: 3180
TimeTrex - Windows 2000 Install Problem
We are getting an install error when using the windows installer in Windows 2000.
It's getting to the postgresql.msi and bombing. With ***unknown" is an unknown command.
Does anyone know any method around this.
It's getting to the postgresql.msi and bombing. With ***unknown" is an unknown command.
Does anyone know any method around this.